Mountain rivers power most of the country. Thousands of kilometres of irrigation canals still flow past, unused.
1 · A hydropower country
Four fifths from water.
Hydropower provides about four fifths of Georgia’s own electricity. In winter, the country still imports power, so every new local source counts.
Embassy of the Czech Republic in Tbilisi, via BusinessInfo.cz
2 · The canals
The canals are coming back.
Irrigated land fell from 386,000 hectares in the 1980s to 88,000 in 2015. Today the canals are being restored, and every drop in them is energy waiting to be used.
ADB, Partnership Report 2025
3 · Rules for small power
Small power is welcome.
Georgian rules let micro power plants up to 500 kW, including hydro, offset their own use and sell the surplus to the grid. More than a thousand are already connected.
Energy Community, EU4Energy (GNERC net metering) · CBW
4 · PROTUR
A turbine without blades.
Made in the Czech Republic, or built with local partners. It needs a drop of just 0.6 m, runs day and night, and needs no dam and no oil.
The canal itself, the vineyard beside it, and a village up in the mountains.
1Main canal
Main canal · Kakheti · gates & sensors
2Wine cellar
Canal by the vineyard · Kakheti · wine cellar
3Mountain village
Mill race · mountains · village
Canals: illustration, not exact routes
1MAIN CANAL · KAKHETICanal gates and sensorsMain canal · Kakheti · gates & sensors2BY THE VINEYARD · KAKHETIA wine cellarCanal by the vineyard · Kakheti · wine cellar3MOUNTAIN VALLEYA village on an old mill raceMill race · mountains · village
Kakheti
Example 1 of 3 · Kakheti
The canal powers itself.
Why here Canal gates and water sensors need power, often far from the nearest line.
The gates are opened by hand, and nobody knows the flow until someone drives out.
Turbine 1 powers the water sensors and sends the data.
Turbine 2 drives the gate motor.
Turbine 3 feeds the surplus into the grid.
What it shows The canal measures, controls and powers itself.
The canal measures, controls and powers itself.
Turbines
3 / 3
Power
2.8 kW
Per day
68 kWh
3 × PROTUR 600 side by side · 270 litres per second · 1.2 m drop
Example data
Example 2 of 3 · Kakheti
The wine stays cool.
Why here Kakheti is wine country, and a canal often runs right past the vineyard.
In the harvest heat, cooling the cellar runs up the electricity bill.
Turbine 1 keeps the fermentation cool, day and night.
Turbine 2 lights the cellar and the courtyard.
What it shows Water from the same canal grows the grapes and cools the wine.
Water from the same canal grows the grapes and cools the wine.
Turbines
2 / 2
Power
0.87 kW
Per day
21 kWh
2 × PROTUR 300 side by side · 75 litres per second · 1.0 m drop
Example data
Example 3 of 3 · Mountain village
The old mill race works again.
Why here Mountain villages once ran mills on small streams. The channels are still there.
When storms cut the line, the village and its guesthouses go dark.
Turbine 1 keeps the school and the shop lit.
Turbine 2 powers the guesthouse for visitors.
Turbine 3 on the next step heats water. The same water works three times.
What it shows A channel built for flour now makes light.
A channel built for flour now makes light.
Turbines
3 / 3
Power
1.5 kW
Per day
36 kWh
3 × PROTUR 300 one after another · 40 litres per second · 3 steps of 1.5 m
Example data
Gates opened by handWater sensors · dataGate motorSurplus to the gridHarvest heat · costly coolingFermentation coolingCellar and courtyard lightsQvevri in the groundStorm cuts the lineSchool and shopGuesthouseHot water · next step
9 · What they share
What the three have in common.
A drop of at least 0.6 m.1Main canal: 1.2 m2Wine cellar: 1.0 m3Mountain village: 3 × 1.5 m
Water that flows through the season.1Main canal: Main canal2Wine cellar: Canal by the vineyard3Mountain village: Mill race
Power needed right there.1Main canal: Canal gates and sensors2Wine cellar: A wine cellar3Mountain village: A village on an old mill race
And a grid ready to take the surplus.1Main canal: Surplus to the grid2Wine cellar: Net metering up to 500 kW3Mountain village: A line to the village
Possible places, not surveyed
10 · Czechia and Georgia
A long partnership.
Georgia has long been a priority country of Czech development cooperation, with projects in rural development and natural resource management. This could be the next one.
Ministry of Foreign Affairs of the Czech Republic
11 · Next step
The next step would be simple.
One canal section, chosen together with Georgian partners. Twelve months: measure the water, install the first turbines, share all the data. Then decide where to go next.
01
Measure
Flow and drop
02
Install
The first turbines
03
Share
All data, openly
12 · What each side gains
What each side gains.
For Georgia
Turbines can be assembled in Georgia, with a local partner.
Power from canals that already exist.
Better-run canals: measured, controlled, powered.
Local technicians trained to install and run them.
For us
Field experience in the Caucasus and a partner to grow with.
Relief: AWS Terrain Tiles (SRTM) · Border and Kakheti: Natural Earth · Rivers derived from the relief
Places
Three places. In numbers.
Example data
Canal gates and sensors
Main canal
PROTUR 600
2.8kW
Powers
Water sensors and data, gate motor, surplus to the grid